Screen power
Assess grid access, capacity and expansion potential.
For data centres, value is determined not by the property alone, but by the interaction of connection capacity, redundancy, connectivity and planning feasibility.

We consider power, grid infrastructure, planning law and location quality as one connected profile. Only then can it be determined whether a site is suitable for operators or investors.
Across Germany, a documented commitment from the grid operator often determines the viability of a project earlier than any construction issue. Technical evidence is provided by the appointed specialist planners and experts.
Assess grid access, capacity and expansion potential.
Structure redundancy and operational requirements.
Review fibre access, latency and network proximity.
Align planning, permitting and stakeholder context.
Grid connection point, secured capacity in MW and a documented statement from the grid operator regarding the expansion stage.
Supply concept from N+1 to 2N, backup power, UPS concept and maintainability during ongoing operation.
Number and physical separation of fibre routes, carrier diversity and latency to relevant network nodes.
Commercial or industrial zoning, development plan, height development and parking requirements.
Approval requirements for backup power systems and noise protection in relation to neighbouring properties.
Free cooling, water demand and heat rejection concept in relation to the site.
Ability to connect to existing heat networks and requirements under the German Energy Efficiency Act.
Sufficient site depth for transformers, generators, deliveries and later expansion stages.
You are planning colocation, hyperscale or edge capacity and need a site with a robust power, network and permitting profile.